IMPERIAL TARRACO HOTEL

The refurbishment of the Imperial Tarraco Hotel’s facilities included the five floors dedicated to 33 guest rooms, offices and technical areas. The top floor is home to 5 guest suites and a technical area, and the roof houses technical areas such as the telecommunications room, elevator machine rooms, antennas, etc. as well as the machine […]

IBERSOL ANTEMARE HOTEL & SPA

Installations and works corresponding to the complete refurbishment of the Ibersol Antemare Hotel & Spa in Sitges, Barcelona. Suris installed the following systems: HVAC, control, DHW production, plumbing, fire protection, LV and voice and data.

SANGULÍ CAMPSITE, SALOU

Installation of facilities and systems in the service building and the central offices of the Sangulí Campsite in Salou. The works were carried out in the DHW production room for the new phase of the bungalow expansion project, where they installed the HVAC, fire protection, LV, voice and data, DHW production and energy recovery systems.  […]

MAR MEDITERRANEA HOTEL

The “FERGUS HOTELS” hotel chain acquired the old “Los Pinos” Hotel in Santa Susanna and embarked on a project to completely refurbish the entire building on the seafront. Thereby creating a superior 4 star hotel with a modern and minimalist design. The hotel has 128 guest rooms and its target market is adults and couples. […]

HOTEL VUELING

In partnership with the airline Vueling, “Hoteles Catalonia” has acted as promoters on the construction project of a 4 star hotel in the centre of Barcelona. The result of this ground-breaking alliance between a hotel chain and an airline company is a unique hotel with 63 guest rooms and a design inspired by the air […]

INTERNACIONAL HOTEL

This hotel enjoys a privileged position in the heart of the tourist and commercial centre of Barcelona, situated in the middle of the Ramblas in front of the renovated “Gran Teatro del Liceu” theatre. The hotel has 59 guest rooms with en-suite bathrooms, heating and telephones, with parking just 100m away. Suris S.L. carried out […]

THE PALACE HOTEL, BARCELONA

The Palace (Barcelona) undertook an important restauration project in which they invested more than 20 million euros, resulting in a new look for the guest rooms, redecoration of the communal areas and the optimization of the architectonic infrastructure.   SURIS S.L. was involved in the development of the Palace Hotel’s refurbishment project and carried out […]

DATA PROCESSING CENTRE

COLT TELECOM’s new Data Centre is classified as TIER 4 and has a total surface area of 3,000 m2. As the only contractor working on this project, SURIS carried out the complete structural adaptation and reinforcement of the existing floors of the building, as well as the technical floors of the different rooms.   The […]

BARCELONA FOOTBALL CLUB

The scope of the works that SURIS carried out in Barcelona Football Club’s stadium encompassed the disassembly of the existing lighting system and the installation of new floodlighting for the pitch and diesel generators. SURIS installed 348 flood lights of 2,000W each (total illumination capacity of 696KW). The systems were adapted to incorporate network switches […]

VILADECANS BUSINESS PARK

Works were carried out to install electromechanical systems in the new office complex “VILADECANS BUSINESS PARK” located between the C32 motorway and Avenida Siglo XXI, in Viladecans (Barcelona). The main characteristics of this project are that the complex is comprised of four buildings (Australia, Brazil, Canada, and Denmark) with a total of 33,864 m2 of […]