AENA AIRPORT T1 EL PRAT DE LLOBREGAT

The Spanish airport company Aeropuertos Españoles y Navegación Aérea (AENA) implemented 35 new billing desks in the Airport of Barcelona in the Inter-modal and Connection Building between Terminals A and B of the Airport. Suris carried out the electro-mechanical installations, with the following total climatized surface area: Total electrical power installed: 2400 KW + 800 […]

TMB LINE 9

Suris carried out conditioning works and full installations of the stations of Gorg, La Salud, Llefià and Bon Pastor, including the junction pits of Line 9 of the Underground Metro of Barcelona. The scope of the works carried out covers the following: Plumbing, medium voltage, low voltage, ventilation and climatization, fire protection, sanitation and drainage.

TMB LINE 5

In these works, conditioning works and full installations of the stations of Carmel, La Taixonera and Vall d’Hebrón were carried out, including the inter-station junction pits of Line 5 of the Underground Metro of Barcelona. The scope of the works carried out by Suris, S.L. covers the following: Electrical installations of medium voltage, low voltage, […]

VALENTINE

At Barnices Valentine, they are experts in paints and they are committed to quality and respect for the environment. The facilities are of 25,000 m² and they have become one of the most technologically-advanced factories in Europe. Suris carried out the installations of HVAC, fire detection and extinguishing, smoke control and evacuation, high-voltage and low-voltage […]

LA VANGUARDIA

Cre-a has two latest-generation printing presses, which began to operate in the Zona Franca area of Barcelona and which print the newspapers La Vanguardia and El Mundo Deportivo, among other publications. The industrial project was designed by the Godó group. Suris carried out the installations of electricity and climatization, on a 21,700 m² plot of […]

TERSA GAVA

TERSA is an urban waste processing and selection company. SURIS has carried out the full redevelopment of the plant in the bulk and packaging zone. The general distribution panels of the plant, lighting, power, and system control panels have been changed, including all associated installations, with the SCADA system and control, automating the new bulk waste […]

The temporary joint venture UTE TEM Tratamientos Ecológicos del Maresme

On 1 January 2007, the temporary joint venture UTE TEM (Tratamientos Ecológicos del Maresme) assumed the concession for the Integral Waste Valuation Centre of El Maresme for a period of 15 years.  The new assignee companies are implementing renewable energies in the new facilities, with the result of this being the creation of some thirty […]

LUKOIL TERMINAL DE ALMACENAJE Y DISTRIBUCION

This is a terminal for storage and distribution of petrol and biofuel products located in the Port of Barcelona. The storage capacity is 360,000 m3, distributed in 12 tanks with a range of capacities of 6000 m3 to 40,000 m3. The installations carried out are the following: ELECTRICITY 25-kV reception and transformation centre and two […]

MEROIL PORT OF BARCELONA

This is a terminal for storage and distribution of petrol and biofuel products located in the Port of Barcelona. The storage capacity is 650,000 m3, distributed in 32 tanks with a range of capacities of 3000 m3 to 30,000 m3. It has 7 islets for the loading of tanker trucks, fully automated, with a load […]

ENTABAN Biodiesel Plant in Bilbao

This is a biodiesel production and storage plant located in the Port of Bilbao, on a plot of 25,000 m2 and with a production of 200,000 tonnes /year The installations carried out include the biodiesel production plant as well as loading and offloading operations, both for vessels and trucks, both biofuel and chemical: ELECTRICITY General […]